Sidi Daoued Fishing Harbour
| |
GENERALINFORMATION
| Exploitation Date |
1983 |
| Extension |
--- |
| Geographical position |
37° 00' North et 10° 54' East |
| Governorate |
Nabeul |
| Global Cost |
2.2 MD |
| Type |
Costal harbour |
INFRASTRUCTURE
| Dike |
910 m |
| Quay |
187 m of 2 m |
| Floating quay |
400 m of 2 m |
| Basins |
2,5 ha |
| Harbour public domain |
8 ha |
| Markers |
07 (04 green and 03 red) |
| Fences |
120 m |
| Network - Lighting |
18 Candelabras |
| Projectors |
--- |
| Drinking water |
01 distributor |
| Electricity |
--- |
| Network - Purification |
120 m |
| Extinction of fires Point |
--- |
SUPERSTRUCTURE
| hoist equipment |
Slip way 01 T, 01 Crain travel lift 17 T |
| Slip way |
--- |
| Ramendage space |
--- m² |
| Fish market space for export |
--- m² |
| Fish market space under the levelling program |
200 m² |
| Diesel station |
01 with a capacity of 40 m 3 |
COLD FACILITIES
Designation |
Property |
| |
APIP |
Private |
Refrigerated complexes (Nbre) |
01 |
02 |
Storage capacity in T (0°C) |
05 |
50 |
| Storage capacity in T (-25°C) |
--- |
500 |
| Tunnel capacity (T/D) |
--- |
15 |
| Ice storage capacity in T |
15 |
15 |
| Ice production in (T/D) |
03 |
08 |
|
|
|
|